Zum Inhalt springen
Application of a mathematical model to an intermediate- to long-term real-world steel production planning problem based on standard software
-
Link:
-
-
Autor/in:
-
-
Erscheinungsjahr:
-
2011
-
Medientyp:
-
Text
-
Schlagworte:
-
-
Steelmaking
-
Continuous casting
-
Steelmaking-continuous casting
-
Scheduling
-
Algorithms
-
Optimization
-
Steelmaking
-
Continuous casting
-
Steelmaking-continuous casting
-
Scheduling
-
Algorithms
-
Optimization
-
Beschreibung:
-
-
In this paper, a case study accomplished for the production planning of a German steel producer is presented. This includes the description of a lot-sizing problem and a related simple mathematical model formulated in order to meet the requirements for the mid- to long-term planning of the steel producer. Both the mathematical model and the representation of the results had to be implemented based on standard software products, namely the 'ILOG OPL-Studio' from IBM and the 'Advanced Planner and Optimizer' (APO) from SAP. The main focus is on the model and its implementation. That is, we show that a real-world problem can be solved by means of a simple mathematical model and standard software products reducing the individual programming effort. © 2011 Inderscience Enterprises Ltd.
-
Lizenz:
-
-
info:eu-repo/semantics/closedAccess
-
Quellsystem:
-
Forschungsinformationssystem der UHH
Interne Metadaten
- Quelldatensatz
- oai:www.edit.fis.uni-hamburg.de:publications/1b48d71a-2e11-4f8f-8d72-2a3dd457bce0